
Right. I had basically convinced myself that I really didn't need an elaborate $2500 50 amp control panel. After all, I had my two Ranco temp controllers controlling automatic HLT coil by-pass and gas solenoid for HLT temp burner and that all worked smashing. All I wanted out of electric backup was a little faster HLT temp ramp (for large step mashes) and being able to sustain a boil in the cold winter months on a full 14 gallons. That really only needed a simple 30A switch box and I could move the cord from the HLT to the BK easily once that transition was ready...