Thursday, March 4, 2021

Brew Tree Valve Setup

Finally got a mixture of single and three way valves ordered and enough triclamps and fittings to start working on fitting routing for my two pumps to perma-mount all the brew valves to allow me to not have to swap hoses during brew, and cross pump everywhere I want. This includes incorporation of a RIMS assist heating element for HLT and strike water temp boost heating and ability to heat strike water in boil kettle while bringing the HLT up to temp as well then cross transfer into mashtun. Finally, ability to pump boil through counter flow chiller and back into boil kettle to get temp to a hop stand for aroma hop additions, followed by diverting to fermenter.

Most Popular Blogs